Media

Provide you with the latest information

Shipment of CS SMLS Pipes

Time : 2020-04-15

After nearly two-month lock down, China factories resume production.  All walks of life are gradually returning to normal. This is our lastest pipes shipment.

  • ASTM A106/A53/API 5L
  • ASTM A179

 

技术支持:讯博网络