Shipment of CS Fittings
Time : 2018-04-10
After a long Chinese New Year Holiday and environmental protection period, factory production returned to normal finally. Now production period is shortened.
A batch of carbon steel fittings was loaded into container and is being sent to the Southeast Asia.